Construction, assembly and commissioning, under EPC regime, of a gas delivery unit. It is a type IV unit with minimum flow of 39,600 m³/day and maximum flow of 990,000 m³ at 1 atm and 20ºC, and it will be responsible for the interconnection of Iacanga with the Bolivia-Brazil gas pipeline (GASBOL).
COMPANY
Forship Engenharia
VALPARAÍSO GAS DELIVERY STATION
PERIOD
2009
LOCATION
Valparaíso – São Paulo – Brazil
SERVICE
Construction, assembly and commissioning, under EPC regime, of a type II gas delivery unit with minimum flow of 13,600 m³/day and maximum flow of 255,00 m³ at 1 atm and 20ºC.